Service Manuals, User Guides, Schematic Diagrams or docs for : Agilent 5991-2966EN Reducing Device-Failure Risk with a Black-Box Recorder - Application Note c20141107 [6]

<< Back | Home

Most service manuals and schematics are PDF files, so You will need Adobre Acrobat Reader to view : Acrobat Download Some of the files are DjVu format. Readers and resources available here : DjVu Resources
For the compressed files, most common are zip and rar. Please, extract files with Your favorite compression software ( WinZip, WinRAR ... ) before viewing. If a document has multiple parts, You should download all, before extracting.
Good luck. Repair on Your own risk. Make sure You know what You are doing.




Image preview - the first page of the document
5991-2966EN Reducing Device-Failure Risk with a Black-Box Recorder - Application Note c20141107 [6]


>> Download 5991-2966EN Reducing Device-Failure Risk with a Black-Box Recorder - Application Note c20141107 [6] documenatation <<

Text preview - extract from the document
Keysight Technologies
Reducing Device-Failure Risk
with a Black-Box Recorder




        Application Note
Introduction

     Protecting against damage in test for aerospace/defense and automotive devices -- or any
     devices that are time consuming and costly to replace -- is essential to meeting delivery and
     budget objectives. When the risk of device failure is of signiicant concern, test planning should
     include strategies and equipment that can help you reduce the risk.

     Even after planning carefully, taking extensive precautions, and executing a test plan step by
     step, DUTs may still fail. DUTs may fail for a variety of reasons beyond DUT laws, among them
     human error, test equipment failure, and controller failure. When a failure occurs, you need to
     identify and understand the failure mechanism to avoid a repeat. Better still is to detect con-
     ditions that can lead to DUT failure and to act to prevent damage. The Keysight Technologies, Inc.
     N7908A black-box recorder (BBR) can provide the necessary functionality. As in commercial
     aviation, and increasingly in automobiles and other high-value equipment, a BBR can provide
     critical failure-mode insight and can play an important role in test strategy development aimed
     at reducing the risk of failure. You can gain insight about the operation and health of a DUT from
     examining the power source output and status data captured during a test cycle. The N7908A
     BBR is a user-installable accessory available for the Keysight Advanced Power System N6900
     and N7900 Series DC power supplies.

     Keysight black-box recorder
     The Keysight BBR runs in the background to continuously log the power supply's measured param-
     eters and various other events. Logging starts automatically when the unit is turned on. Logging
     does not interfere with any source or measurement features of the power supply. It never stops, and
     data is preserved after a power cycle. Data logging can be performed every 10 ms or every 100 ms.
     At the 10-ms logging rate, you can log 24 hours of continuous data, and at the 100-ms rate, you
     can log 240 hours of data. Recorded measurements include average, minimum, and maximum
     voltage, current, and power. Logged events include system status bits that might affect sourcing,
     two user-deined status bits, front-panel keys pressed, SCPI command received, and trigger events.
Examining and analyzing recorder data to understand DUT failures
                      BBR data can help you analyze DUT failures by providing time-stamped records of events
                      and measurements of voltage, current, and power levels, as well as power-supply status
                      -- both leading up to the point of DUT or test-equipment failure and after the failure. When
                      the BBR clock is synchronized with the test-system controller and events external to the
                      power source are also recorded and time stamped, examining and analyzing the data may
                      provide a crucial link that can help you reconstruct the problem and determine the failure
                      mechanism. Voltage, current and power data coupled with power supply status captured
                      every 10 or 100 ms compared with expected values and conditions can help you discover
                      if a failure was the result of a test configuration error, test equipment malfunction, or an
                      isolated DUT failure. When a failure is not caused by test error or equipment malfunction,
                      BBR data such as higher- or lower-than-expected voltage, current or power as well as
                      short duration surges may help to uncover DUT flaws.

                      When a DUT fails or an unexpected event occurs during test, you can examine BBR voltage,
                      current, and power entries along with a broad array of status bits for anomalous values
                      and conditions. In addition to power-source output measurements, the BBR can record 31
                      status/event items. Recorded status states range from power-supply output operating mode
                      to power-supply programming to fault conditions to user-defined status events (see Figure
                      2). You can view up to 12 user-selectable status items with the Power Assistant software
                      (see Figure 1). Figure 1 shows the PC-based Keysight N7906A Power Assistant software
                      interface to the BBR. To facilitate a review of BBR data while testing is in progress, you can
                      use the software to capture and view snapshots with a specified time range.




                      Figure 1: Keysight N7906A Power Assistant software interface to the BBR

                      1.   The area on top of the display indicates the total time period of the snapshot.
                      2.   The yellow line is the output voltage.
                      3.   The green line is the output current.
                      4.   The green portion of the window displays the status states.
                      5.   The vertical red lines indicate when power was cycled on or off.
                      6.   The pale blue dots on the timeline indicate where a user-defined message was placed into the log.




                                                    3
Using BBR capability to establish and execute DUT test strategy
                      When it is critical that a test strategy includes a measured approach to the application of
                      power and loading on a DUT, the BBR can provide a useful record of events for each stage
                      of testing. When test-result expectations are not fully determined or understood prior to
                      test execution, you may need to use a cautious, incremental test approach to confirm the
                      DUT is operating within a safe range in each stage. For DUTs early in the development
                      cycle, test-result expectations may be preliminary. For DUTs in final stages of development,
                      test-result expectations will generally be firm. For either situation, the examination of BBR
                      data for appropriate or inappropriate source output levels or surges of current, voltage
                      and power and power supply status for each test stage may help you determine if testing
                      should continue, or if you need to modify the test or the DUT before proceeding.

                      For some DUTs, testing involves the application of a range of voltages and a range of
                      loads. Here, too, the BBR can be helpful and can provide useful information as you adjust
                      test conditions. In some cases, the testing of a multifaceted, multisubsystem DUT must
                      be done on a subsystem-by-subsystem basis, the results of which become a determining
                      factor for continuing on to each additional subsystem. For some subsystems or for an
                      entire DUT, it may be advisable to apply power to and/or loading on the DUT in measured
                      increments. Recorded power supply status and output levels during each incremental test
                      may help you determine the response of the DUT to additional changes in DUT stimulation
                      and loading. Examining the data may provide insight into device performance and whether
                      moving to higher stress levels of testing is appropriate.




Using BBR data to augment quality assurance measures
                      When a DUT is a finished product you intend to deliver to an end customer, quality assur-
                      ance plays an important role in ensuring product performance and life, and is most critical
                      when the product, such as a satellite, cannot be serviced once deployed. Inappropriate
                      and unexpected stress levels may not cause immediate DUT failure, but may cause or
                      contribute to the weakening of components in the DUT, potentially leading to early failure.
                      You can examine BBR recordings for anomalies to help verify that a DUT was operated
                      within safe parameters. For example, some devices require multiple bias voltages that
                      must be applied and removed in a specific order. Deviation may result in immediate failure,
                      but worse would be an undetected misapplication of voltage resulting in a potentially
                      shortened product life. Other potentially product-life-shortening events could result from
                      operator error, test-equipment malfunction or software glitches. The BBR records test-
                      system conditions that affect power-source status and output levels.




                                                4
Status                                             Status                                           Status
/event       Description                           /event      Description                          /event   Description
CV           Regulating in CV mode                 Trans       A Step or List transient is active   USTAT2   User-defined status 2
             (voltage priority only)               Active
LIM+         Output is in +current limit in        VPRI        Instrument is set to voltage priority CP      Negative over-power protection
             voltage priority                                  mode                                          tripped

             Output is in +voltage limit in
             current priority
IPK          Output is in positive peak            CP+         Positive over-power protection       CSF      Current sharing fault has
             current                                           tripped                                       occurred
IPK-         Output is in negative peak            CC          Regulating in CC mode                PCHG     Programming DAC setting has
             current                                           (current priority only)                       changed
UNR          Output is unregulated                 LIM         Output is in 



◦ Jabse Service Manual Search 2024 ◦ Jabse PravopisonTap.bg ◦ Other service manual resources online : FixyaeServiceinfo