Service Manuals, User Guides, Schematic Diagrams or docs for : Keithley 3910 3910_902_01A

<< Back | Home

Most service manuals and schematics are PDF files, so You will need Adobre Acrobat Reader to view : Acrobat Download Some of the files are DjVu format. Readers and resources available here : DjVu Resources
For the compressed files, most common are zip and rar. Please, extract files with Your favorite compression software ( WinZip, WinRAR ... ) before viewing. If a document has multiple parts, You should download all, before extracting.
Good luck. Repair on Your own risk. Make sure You know what You are doing.




Image preview - the first page of the document
3910_902_01A


>> Download 3910_902_01A documenatation <<

Text preview - extract from the document
   Model 3910
Function Synthesizer
      Service Manual




                Contains Operating and Servicing Information
                                                         WARRANTY
Kcithley Instruments, Inc. warrants this product to be free from defects in material and workmanship for a period of 1 year from date of
shipment.


Kcithley Instruments, Inc. warrants the following items for 90 days from the date of shipment: probes, cables, rechargeable batlcrics,
diskettes. and documentation.


During the warranty period, we will, at our option, either repair or replace any product that proves to be defective.


To exercise this warranty, write or call your local Keithley representative, 01`contact Keithley hcadquaxters in Cleveland, Ohio. You will
bc given prompt assistance and return instructions. Send the product, transportation prepaid, to the indicated service facility. Repairs
will bc made and the product returned, transportation prepaid. Repaired or replaced products are warranted for the balance of the origi-
nal warranty period, or at least 90 days.


                                                LIMITATION         OF WARRANN

This warranty does not apply to defects resulting from product modification without Keithley's express written consent, or misuse of
any product or part. This wzuranty also does not apply to fuses, software, non-rechargeable batteries, damage from battery leakage, or
problems arising from normal wear or failure to follow instructions.


THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING ANY IMPLIED
WARRANTY OF MERCHANTABILITY    OR FITNESS FOR A PARTICULAR USE. THE REMEDIES PROVIDED HEREIN ARE
BUYER'S SOLE AND EXCLUSIVE REMEDIES.


NEITHER KEITHLEY INSTRUMENTS, INC. NOR ANY OF ITS EMPLOYEES SHALL BE LIABLE FOR ANY DIRECT, INDI-
RECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE USE OF ITS INSTRUMENTS AND
SOFTWARE EVEN IF KEITHLEY INSTRUMENTS, INC., HAS BEEN ADVISED IN ADVANCE OF THE POSSIBILITY OF
SUCH DAMAGES. SUCH EXCLUDED DAMAGES SHALL INCLUDE, BUT ARE NOT LIMITED TO: COSTS OF REMOVAL
AND INSTALLATION, LOSSES SUSTAINED AS THE RESULT OF INJURY TO ANY PERSON, OR DAMAGE TO PROPERTY.
Model   3910 Function Synthesizer
          Service Manual




          8 1991, Keithley Instruments, Inc.
             Test Instrumentation Group
                 All rights reserved.
              Cleveland, Ohio, U.S.A.
             October 1991, First Printing
        Document Number: 3910-902-01 Rev. A
                                           Manual Print History
The print history shown below lists the printing dates of all Revisions and Addenda created for this manual. The Revision
Level letter increases alphabetically as the manual undergoes subsequent updates. Addenda, which are released between Revi-
sions, contain important change information that the user should incorporate immediately into the manual. Addenda are num-
bered sequentially. When a new Revision is created. all Addenda associated with the previous Revision of the manual are
incorporated into the new Revision of the manual. Each new Revision includes a revised copy of this print history page.


                 Revision   A (oc.c"me",   Number   39 10.902-01)   ,....,,,.,....,.....................................................................   October   ,991
                                                                 Safety Precautions

The following safety precautions should be observed before        Do not exceed the maximum signal levels of the instruments
using this product and any associated instrumentation. Al-        and accessories,as defined in the specifications and operating
though some instruments and accessorieswould normally be          information, and as shown on the instrument or test fixture
used with non-hazardous voltages, there are situations where      rear panel, or switching card.
hazardous conditions may be present.
                                                                  Do not connect switching cards directly to unlimited power
This product is intended for use by qualified personnel who       circuits. They are intended to be used with impedance limit-
recognize shock hazards and are familiar with the safety pre-     ed sources. NEVER connect switching cards directly to AC
cautions required to avoid possible injury. Read the operating    main. When connecting sources to switching cards, install
information carefully before using the product.                   protective devices to limit fault current and voltage to the
                                                                  card.
Exercise extreme caution when a shock hazard is present. Le-
thal voltage may be present on cable connector jacks or test      When fuses are used in a product, replace with ~arnetype and
fixtures. The American National Standards Institute (ANSI)        rating for continued protection against fire hazard.
states that a shock hazard exists when voltage levels greater
than 30V RMS, 42.4V peak, or 60VDC are present. A good            Chassis connections must only be used as shield connections
safety practice is to expect that hazardous voltage is present    for measuring circuits, NOT as safety earth ground connec-
in any unknown circuit before measuring.                          tions.

Before operating an instrument, make sum the line cord is         If you are using a test fixture, keep the lid closed while power
connected to a properly grounded power receptacle. Inspect        is applied to the device under test. Safe operation requires the
the connecting cables, test leads, and jumpers for possible       use of a lid interlock.
wear, cracks, or breaks before each use.
                                                                  If a @screw is present cmthe test fixture, connect it to safety
For maximum safety, do not touch the product, test cables, or     earth ground using #18 AWG or larger wire.
any other instruments while power is applied to the circuit
under test. ALWAYS renwve power from the entire test sys-
tem and discharge any capacitors before: connecting or dis-       `Ihef   B m blo on an instrument or accessory indicates that
                                                                           y
connecting cables or jumpers, installing or removing              IOOOVor more may be present on the terminals. Refer to the
switching cards, or making internal changes, such as install-     product manual for detailed operating information.
ing or removing jumpers.
                                                                  Instrumentation and accessories should not be connected to
Do not touch any object that could provide a current path to      humans.
the common side of the circuit under test or power line
(earth) ground. Always make measurements with dry hands           Maintenance should be performed by qualified service per-
while standing on a dry, insulated surface capable of with-       sonnel. Before performing any maintenance, disconnect the
standing the voltage being measured.                              line cord and all teat cables.
                                              HOW TO USE THIS MANUAL


Details procedures to verify that the Model 3910 Function
Synthesizer meets stated specifications.
                                                                                        SECTION 1
                                                                      Performance              Verification


Describes basic operating principles
the Model 3910.
                                       for the various circuits in                      SECTION 2
                                                                         Principles            of Operation


Covers fuse replacement, battery replacement, calibration
and repair of the instrument, and lists replacement parts.
                                                                                        SECTION 3
                                                                                Service Information


                                                     WARNING
                             The information in this manual is intended for qualified serv-
                             ice personnel who can recognize possible shock hazards. Do
                             not attempt these procedures unless you are qualified to do 80.
                                                   Table of Contents

SECTION       1-       Performance                Verification
1.1      INTRODUCTION            .................                                                                    1-l
1.2      ENVIRONMENTAL               CONDITIONS                    ...       ......................                   1-l
1.3      INITIAL CONDlTIONS                  ............                    ......................                   1-l
1.4      LINEPOWER       ....................                                ......................                   1-l
1.5      RECOMMENDED             TEST EQUIPMBNT . .......................                                             l-1
1.6      VERIFICATION        LIMITS ............                             ......................                   1-z.
1.7      VERIFICATION        PROCEDURES ......                               ......................                   l-2
1.7.1       Frequency Accuracy .............                                 ......................                   l-2
1.7.2       Maximum Output Amplitude                        .............................                             l-3
1.7.3       DCOffset   ............................................                                                   l-4
1.7.4       FrequencyResponse..                 ..................................                                    l-4
1.7.5       Total Harmonic Distortion                  ...............................                                l-6


SECTION 2 -            Principles            of Operation
2.1      INTRODUCTION         .................................                                                       2-l
2.2      BLOCK DIAGRAM             ...............................                                                    2-l
2.3      CIRCUITOPERATION               .............................                                     .           2-l
2.3.1      ControlSection     .................................                                                       2-l
2.3.2      Display and Keyboard Section ......................                                        .....           2-l
2.3.3      Synthesizer ....................................                                                           2-l
2.3.4      AnaIogSection      .................................                                                       2-l
2.3.5      PowerSupply      ..................................                                                        2-l
2.3.6      GPIB Interface. .................................                                                          2-2


SECTION       3-       Service Information
3.1      INTRODUCTION             .............................                                                       3-l
3.2      LINE FLJSE REPLACEMENT                          ....................                                         3-1
3.3      BAWRY        RBPLACEMENT                     .....................                                           3-2
3.4      CALIBRATION            ..............................                                                  . .   3-2
3.4.1       EnvironmentaI Conditions                     ....................                                 . ...   3-3
3.4.2       Initial Conditions         ...........................                                            .       3-3
3.4.3       LinePower      ................................                                                   ..,..   3-3
3.4.4       Recommended Calibration Equipment                                 ...........                     .....   3-3
3.4.5       Cover Removal .............................                                                               3-3
3.4.6       Calibration Adjustment Locations ...............                                                          3-4
3.4.7       DC Offset Calibration              ........................                                               3-4
3.4.8       Amplitude Calibration                .......................                                       . ..   3-6
3.4.9       Square Wave Duty Cycle Calibration .............                                                          3-8
3.4.10      Cover Replacement ..........................                                                         ..   3-8
3.5     FCTN OUT JUMPERS ...............................                                               3-8
3.5.1      Waveform Output On/Off Selection ...................                             ........   3-8
3.5.2      FCTN OUT Open/Short Selection .....................                              ........   3-9
3.6     GI'IB INTERFACE INSTALLATlON                                .....................   ........   3-9
3.6.1      Installation Precautions .............................                           ........   3-9
3.6.2      Board Installation          .................................                    ........   3-9
3.7     REPAIR ..........................................                                   ........   3-12
3.7.1      Factory Service ...................................                              ........   3-12
3.7.2      BoardRemoval           ...................................                       ........   3-12
3.8     REPLACEABLE PARTS ..............................                                    ........   3-15
3.8.1      PartsList    .......................................                             ........   3-15
3.8.2      OrderingParts          ...................................                       ........   3-15


APPENDICES
A       TypicalData..................................................................                  A-l
B       Model 3910 and 3910/11 Specifications                                                          B-l
                                               List of Illustrations

SECTION          1-      Performance            Verification
Figure   l-l          Connections      for   Frequency Accuracy Test     .                                                     .................     l-3
Figure   1-2          Connections      for   Output Amplitude and DC Offset Tests                                              .................     14
Figure   l-3          Connections      for   Frequency Response Tests    ....                                                  .................     l-5
Figure   14           Connections      for   Distortion Tests . .  ..                                                          .................     l-6


SECTION 2 -              Principles          of Operation
Figure 2-l            Block Diagram          ,..............................                                                   .................     2-2


SECTION          3-      Service Information
Figure   3-l          Fuse Replacement ...........................                                            .......................                3-l
Figure   3-2          Battery Replacement .........................                                           .......................                3-2
Figure   3-3          CoverRemoval      .............................                                         .......................                34
Figure   3-4          Calibration Adjustments (Main Board) ...........                                        .......................                3-5
Figure   3-5          Connsctions for TP2 Offset Calibration              ...........                         ......................                 3-5
Figure   3-6          Connections for FCI'N OUT Offset Calibration                    .....                   ......................                 3-6
Figure   3-7          Connections for Amplitude Calibration ...........                                       ......................                 3-7
Figure   3-S          Connections for Square Wave Duty Cycle Calibration                                                                             3-8
Figure   3-9          Jumper Installation      ..........................                                   ....................                     3-9
Figure   3-10         Model 3911 Interface Installation ................                                    ....................                     3-10
Figure   3-l 1        Cover Removal ........................                                  ..........................                             3-11
Figure   3-12         KnobRemoval       ........................                              ..........................                             3-12
Figure   3-13         Connector Removal ....................                                  ..........................                             3-12
Figure   3-14         Removal of 3-Terminal Regulator Screws ....                             ...................                          .......   3-13
Figure   3-15         Connecting Wires ......................                                 ..........................                             3-13
Figure   3-16         Main Board Mounting Screws .............                                ..........................                             3-14
Figure   3-17         Display Board Connector and Screw Locations                             ..........................                             3-15
                                                         List of Tables

SECTION       1-      Performance              Verification
Table l-l          Recommended Test Equipment for Performance Verification                   ....................                    l-2
Table l-2          Reading Limits for Output Amplitude Tests .................................                                       l-3
Table l-3          Reading Limits for Frequency Response Tests ................................                                      l-5


SECTION 3 -           Service Information
Table   3-l        RecommendedLineFuses     ...............................................                                          3-l
Table   3-2        Recommended Test Equipment for Calibration                      ...............................                   3-3
Table   3-3        Relationship Between R29 Value and Amplitude                      ..............................                  3-7
Table   3-4        Relationship Between R4 Value and Square Wave Amplitude                                    ....................   3-7
                               SECTION 1
                  Performance Verification


1.1    INTRODUCTION                                            1.3    INITIAL CONDITIONS

This section covers procedures to verify accuracy of the       The Model 3910 and the test equipment should be turned
Model 3910. Verification can be performed when the in-         on and allowed to warm up for one hour before making
shument is first received to verify that the Model 3910        test measurements. If the instrument has been subjected
meets its stated accuracy specifications, and it can also be   to extreme temperature or humidity, allow additional
performed following calibration, if desired. If the lnshu-     time for stabilization. Typically, it take one additional
ment fails to meet stated specifications, refer to the cali-   hour to stabilize an instrument that is 10



◦ Jabse Service Manual Search 2024 ◦ Jabse PravopisonTap.bg ◦ Other service manual resources online : FixyaeServiceinfo