Service Manuals, User Guides, Schematic Diagrams or docs for : Philips Monitor CD 2001 Monitor CD 2001 E-MANUALS Philips crt 109b2 pdf p09

<< Back | Home

Most service manuals and schematics are PDF files, so You will need Adobre Acrobat Reader to view : Acrobat Download Some of the files are DjVu format. Readers and resources available here : DjVu Resources
For the compressed files, most common are zip and rar. Please, extract files with Your favorite compression software ( WinZip, WinRAR ... ) before viewing. If a document has multiple parts, You should download all, before extracting.
Good luck. Repair on Your own risk. Make sure You know what You are doing.




Image preview - the first page of the document
p09


>> Download p09 documenatation <<

Text preview - extract from the document
                                              Safety Test Requirements                                             109B2 GS3 CM25     9
                                                                                                                      Go to cover page

All units that are returned for service or repair must pass the original   3. Equipments and Connection
manufactures safety tests. Safety testing requires both Hi-pot and
Ground Continuity testing.
                                                                           3.1 Equipments
                                                                               For example :
HI-POT TEST INSTRUCTION                                                        - ChenHwa 9032 PROGRAMMABLE AUTO SAFETY
                                                                               TESTER
                                                                               - ChenHwa 510B Digital Grounding Continuity Tester
1. Application requirements                                                    - ChenHwa 901 (AC Hi-pot test), 902 (AC, DC Hi-pot test)
                                                                               Withstanding Tester
1.1   All mains operated products must pass the Hi-Pot test as
      described in this instruction.                                       3.2 Connection

1.2   This test must be performed again after the covers have                   * Turn on the power switch of monitor before Hipot and
      been refitted following the repair, inspection or modification              Ground Continuity testing.
      of the product.

                                                                                                           Clip
2. Test method

2.1   Connecting conditions

2.1.1 The test specified must be applied between the parallel-
        blade plug of the mainscord and all accessible metal
        parts of the product.
                                                                                                          Clip
2.1.2 Before carrying out the test, reliable conductive
        connections must be ensured and thereafter be
        maintained throughout the test period.

2.1.3 The mains switch(es) must be in the "ON" position.

2.2   Test Requirements

All products should be HiPot and Ground Continuity tested as follows:

 Condition    HiPot Test for      HiPot Test for       Ground Continuity
              products where      products where       Test requirement
              the mains input     the mains input is
                                                                                                 (ChenHwa 9032 tester)
              range is Full       110V AC(USA
              range(or 220V       type)
                                                                                                                   Video cable
              AC)

 Test         2820VDC             1700VDC              Test current:
 voltage      (2000VAC)           (1200VAC)             25A,AC
                                                       Test time:
                                                                               Connect the "video cable"
 Test time    3 seconds           1 second              3 seconds(min.)
                                                                               or "grounding screw"
 (min.)                                                Resistance
                                                                               to the CLIP on your tester.
                                                        required:
 Trip         set at 100 uA       5 mA                  <=0.09+R ohm,
 current      for Max.                                  R is the
 (Tester)     limitation; set                           resistance of
              at 0.1 uA for                             the mains cord.
              Min. limitation
                                                                                                                         Grounding screw
 Ramp         set at 2
 time         seconds
 (Tester)



                                                                             Connect the power cord
                                                                             to the monitor.

2.2.1 The test with AC voltage is only for production purpose,
      Service center shall use DC voltage.

2.2.2 The minimum test duration for Quality Control Inspector
        must be 1 minute. No breakdown during the test.                                                                Power outlet

2.2.3 The test voltage must be maintained within the specified             4. Recording                             (Rear view of monitor)
      voltage + 5%.
                                                                           Hipot and Ground Continuity testing records have to be kept for a period
2.2.4 The grounding blade or pin of mains plug must be                     of 10 years.
      conducted with accessible metal parts.


      Back                                                                                                                            Forward



◦ Jabse Service Manual Search 2026 ◦ Jabse PravopisonTap.bg ◦ Other service manual resources online : FixyaeServiceinfo