Service Manuals, User Guides, Schematic Diagrams or docs for : Philips Monitor Monitor CD 2001[1].part02 Monitor CD 2001 E-MANUALS Philips crt 105b2 105b2_pdf p81

<< Back | Home

Most service manuals and schematics are PDF files, so You will need Adobre Acrobat Reader to view : Acrobat Download Some of the files are DjVu format. Readers and resources available here : DjVu Resources
For the compressed files, most common are zip and rar. Please, extract files with Your favorite compression software ( WinZip, WinRAR ... ) before viewing. If a document has multiple parts, You should download all, before extracting.
Good luck. Repair on Your own risk. Make sure You know what You are doing.




Image preview - the first page of the document
p81


>> Download p81 documenatation <<

Text preview - extract from the document
                                                Safety test requirements                                            105B2 CM23 GSIII 81
                                                                                                                      9 Go to cover page

   All units that are returned for service or repair must pass the         3. Equipments and Connection
   original manufactures safety tests. Safety testing requires both
   Hipot and Ground Continuity testing.                                    3.1. Equipments
                                                                                For example :
   HI-POT TEST INSTRUCTION                                                      - ChenHwa 9032 PROGRAMMABLE AUTO SAFETY
                                                                                  TESTER
                                                                                - ChenHwa 510B Digital Grounding Continuity Tester
   1. Application requirements                                                  - ChenHwa 901 (AC Hi-pot test), 902 (AC, DC Hi-pot test)
                                                                                  Withstanding Tester
   1.1 All mains operated products must pass the Hi-Pot test as
       described in this instruction.                                      3.2. Connection
                                                                                 * Turn on the power switch of monitor before Hipot and
   1.2 This test must be performed again after the covers have                     Ground Continuity testing.
       been refitted following the repair, inspection or modification
       of the product.
                                                                                                             Clip

   2. Test method

   2.1 Connecting conditions

   2.1.1 The test specified must be applied between the parallel-
         blade plug of the mainscord and all accessible metal                                                Clip
         parts of the product.

   2.1.2 Before carrying out the test, reliable conductive
         connections must be ensured and thereafter be
         maintained throughout the test period.

   2.1.3 The mains switch(es) must be in the "ON" position.

   2.2 Test Requirements

   All products should be HiPot and Ground Continuity tested as
   follows:                                                                                      (ChenHwa 9032 tester)
    Condition   HiPot Test for    HiPot Test for       Ground Continuity                                              Video cable
                products where    products where       Test requirement
                the mains input   the mains input is
                range is Full     110V AC(USA
                range(or 220V     type)
                AC)                                                            Connect the "video cable"
                                                                               or "grounding screw"
    Test        2820VDC           1700VDC              Test current:           to the CLIP on your tester.
    voltage     (2000VAC)         (1200VAC)             25A,AC
                                                       Test time:
    Test time 3 seconds           1 second              3 seconds(min.)
    (min.)                                             Resistance
                                                        required:
                                                                                                                           Grounding screw
    Trip        set at 100 uA     5 mA                  <=0.09+R ohm,
    current     for Max.                                R is the
    (Tester)    limitation; set                         resistance of
                at 0.1 uA for                           the mains cord.
                Min. limitation

    Ramp        set at 2                                                      Connect the power cord
    time        seconds                                                       to the monitor.

   2.2.1 The minimum test duration for Quality Control Inspector
         must be 1 minute.

   2.2.2 The test voltage must be maintained within the specified                                                        Power outlet
         voltage + 5%.
                                                                                                                      (Rear view of monitor)
   2.2.3 There must be no breakdown during the test.                       4. Recording
   2.2.4 The grounding blade or pin of mains plug must be
                                                                           Hipot and Ground Continuity testing records have to be kept for
         conducted with accessible metal parts.
                                                                           a period of 10 years.

3Back                                                                                                                               Forward4



◦ Jabse Service Manual Search 2026 ◦ Jabse PravopisonTap.bg ◦ Other service manual resources online : FixyaeServiceinfo