Service Manuals, User Guides, Schematic Diagrams or docs for : Samsung Monitor Monitor cha-4217_5807l_154
<< Back |
HomeMost service manuals and schematics are PDF files, so You will need Adobre Acrobat Reader to view : Acrobat Download
Some of the files are DjVu format. Readers and resources available here : DjVu Resources
For the compressed files, most common are zip and rar. Please, extract files with Your favorite compression software ( WinZip, WinRAR ... ) before viewing.
If a document has multiple parts, You should download all, before extracting.
Good luck. Repair on Your own risk. Make sure You know what You are doing.
Image preview - the first page of the document
>> Download cha-4217_5807l_154 documenatation <<Text preview - extract from the document COLOR MONITOR
CHA4217L
CHA4227L
CHA5807L
CHA5227L
SERVICE Manual
COLOR MONITOR CONTENTS
1. Precautions
2. Reference Information
3. Product Specifications
4. Operating Instructions
5. Disassembly & Reassembly
6. Alignment & Adjustments
7. Troubleshooting
8. Exploded View & Parts List
9. Electrical Parts List
10. Block Diagram
11. PCB Diagrams
12. Wiring Diagram
13. Schematic Diagrams
Samsung Electronics Co., Ltd. August 1998
Printed in Korea
Code No.: BH68-61127A
1 Precautions
1-1 Safety Precautions
WARNINGS 2. Inspect all protective devices such as nonmetallic
1. For continued safety, do not attempt to modify the control knobs, insulating materials, cabinet backs,
circuit board. adjustment and compartment covers or shields,
2. Disconnect the AC power before servicing. isolation resistor-capacitor networks, mechanical
insulators, etc.
3. When the chassis is operating, semiconductor
heatsinks are potential shock hazards. 3. Leakage Current Hot Check (Figure 1-1):
WARNING: Do not use an isolation transformer during
1-1-1 Servicing the High Voltage VR this test.
and CRT : Use a leakage current tester or a metering system
that complies with American National Standards
WARNING:Damaged IC202 may cause excessive
Institute (ANSI C101.1, Leakage Current for
x-ray emissions.
Appliances), and Underwriters Laboratories (UL
1. When servicing the high voltage system, remove Publication UL1410, 59.7).
the static charge by connecting a 10 kohm resistor
4. With the unit completely reassembled, plug the AC
in series with an insulated wire (such as a test
line cord directly into a 120V AC outlet. With the
probe) between the chassis and the anode lead.
unit
◦ Jabse Service Manual Search 2026 ◦ Jabse Pravopis ◦ onTap.bg ◦ Other service manual resources online : Fixya ◦ eServiceinfo