Service Manuals, User Guides, Schematic Diagrams or docs for : Samsung TV SPT51A SPM43888PTR

<< Back | Home

Most service manuals and schematics are PDF files, so You will need Adobre Acrobat Reader to view : Acrobat Download Some of the files are DjVu format. Readers and resources available here : DjVu Resources
For the compressed files, most common are zip and rar. Please, extract files with Your favorite compression software ( WinZip, WinRAR ... ) before viewing. If a document has multiple parts, You should download all, before extracting.
Good luck. Repair on Your own risk. Make sure You know what You are doing.




Image preview - the first page of the document
SPT51A SPM43888PTR


>> Download SPT51A SPM43888PTR documenatation <<

Text preview - extract from the document
                   PROJECTION TV RECEIVER
                   Chassis :   SPT51A (VERSION1)
                   Model:      SPM5288PF
                               SPM5288PTR
                               SPM4388PF
                               SPM4388PTR




PROJECTION TV RECEIVER                      CONTENTS
                                  1. Precautions

                                  2. Reference Information

                                  3. Specifications

                                  4. Disassembly and Reassembly

                                  5. Alignment and Adjustment

                                  6. Troubleshooting

                                  7. Exploded View and Parts List

                                  8. Areas and Option Specification

                                  9. Electric Parts List

                                  10. Block Diagrams

                                  11. Wiring Diagram

                                  12 Schematic Diagrams
1. Precautions
Follow these safety, servicing and ESD precautions to prevent damage and protect against potential
hazards such as electrical shock and X-rays.

1-1 Safety Precautions

1. Be sure that all of the built-in protective
   devices are replaced. Restore any missing
   protective shields.

2. When reinstalling the chassis and its
   assemblies, be sure to restore all protective
   devices, including: nonmetallic control
   knobs and compartment covers.

3. Make sure that there are no cabinet
   openings through which people--
   particularly children--might insert fingers
   and contact dangerous voltages. Such                           Fig. 1-1 AC Leakage Test
   openings include the spacing between the
   picture tube and the cabinet mask,               6. Antenna Cold Check:
   excessively wide cabinet ventilation slots,         With the unit's AC plug disconnected from
   and improperly fitted back covers.                  the AC source, connect an electrical jumper
                                                       across the two AC prongs. Connect one
    If the measured resistance is less than 1.0        lead of the ohmmeter to an AC prong.
    megohm or greater than 5.2 megohms, an             Connect the other lead to the coaxial
    abnormality exists that must be corrected          connector.
    before the unit is returned to the customer.
                                                    7. X-ray Limits:
4. Leakage Current Hot Check (Figure 1-1):             The picture tube is especially designed to
   Warning: Do not use an isolation                    prohibit X-ray emissions. To ensure
   transformer during this test. Use a leakage-        continued X-ray protection, replace the
   current tester or a metering system that            picture tube only with one that is the same
   complies with American National Standards           type as the original. Carefully reinstall the
   Institute (ANSI C101.1, Leakage Current for         picture tube shields and mounting
   Appliances), and Underwriters Laboratories          hardware; these also provide X-ray
   (UL Publication UL1410, 59.7).                      protection.

5. With the unit completely reassembled, plug       8. High Voltage Limits:
   the AC line cord directly into the power            High voltage must be measured each time
   outlet. With the unit's AC switch first in the      servicing is done on the B+, horizontal
   ON position and then OFF, measure the               deflection or high voltage circuits. Correct
   current between a known earth ground                operation of the X-ray protection circuits
   (metal water pipe, conduit, etc.) and all           must be reconfirmed whenever they are
   exposed metal parts, including: antennas,           serviced. (X-ray protection circuits also may
   handle brackets, metal cabinets, screwheads         be called "horizontal disable" or "hold-
   and control shafts. The current measured            down".)
   should not exceed 0.5 milliamp. Reverse the
   power-plug prongs in the AC outlet and              Heed the high voltage limits. These include
   repeat the test.                                    the X



◦ Jabse Service Manual Search 2024 ◦ Jabse PravopisonTap.bg ◦ Other service manual resources online : FixyaeServiceinfo