Service Manuals, User Guides, Schematic Diagrams or docs for : xerox notetaker memos 19780306_NoteTaker_I_Project_Plan
<< Back |
HomeMost service manuals and schematics are PDF files, so You will need Adobre Acrobat Reader to view : Acrobat Download
Some of the files are DjVu format. Readers and resources available here : DjVu Resources
For the compressed files, most common are zip and rar. Please, extract files with Your favorite compression software ( WinZip, WinRAR ... ) before viewing.
If a document has multiple parts, You should download all, before extracting.
Good luck. Repair on Your own risk. Make sure You know what You are doing.
Image preview - the first page of the document
>> Download 19780306_NoteTaker_I_Project_Plan documenatation <<Text preview - extract from the documentNoteTaker
A Portable Computing System
XEROX PALO ALTO RESEARCH CENTER
Systems Science Laboratory
LSI Systems Area
March 6, 1978
For Xerox Internal Use Only
Subject: NoteTaker Project Plan
From: Douglas Fairbairn
stored: [MAXC1 ] llr\\A#
UIIVYV
i+
IL
+"
LV
" " .......... 0.1"+
,",Vllln''''''L
directly to the mouthpiece of any standard telephone.
- An external bus interface which will allow other devices to be connected to the
NoteTaker. One of the most important of these devices is an Ethernet interface.
This interface is planned to be external because it will only be needed when the
unit is actually near the ethernet itself. There seems no point in carrying the
interface and its power requirements with the machine all the time.
- The architecture of the system wll be such that a small number of processors
can be operated in paraiiei. Aithough these extra processors wiii not fit within the
package, the system will offer a useful test-bed for experimenting with multi-
processor architectures.
- The package will be about 18/1 wide, 14" deep, and 6/1 high. The total weight
without batteries will be less than 25 Ibs. A goal is to make the weight 20 Ibs. or
less.
2.0 System Architecture
A preliminary block diagram of the NoteTaker system is shown in Appendix A. There are
three basic subsystems. One is the LSI processor which will be constructed principally
from custom LSI chips. This subsystem will be composed of an ALU chip, perhaps two
control chips, two address mapping chips, an IFU, and a cache holding 1K -2K words of
local state. The custom chips will contain their own RAM control memory. The cache
itself will likely consist of standard components. Of the other four chip types, only three
will be designed and fabricated during the first phase of the project. These are the ALU,
the Control, and address mapping chips. The IFU will be added as time is available. For
a description of the basic architectural principals of this processor, see the memo "A
VLSI Microprogrammed Processor", by C. Thacker.
The memory subsystem is the second important element in the NoteTaker. This main
memory will be constructed of 16K dynamic RAMs and will include single-bit error
correction and double-bit detection. There will be a minimum of 128K words of memory.
This number will grow to 512K when 64K memory chips become available. The memory
controller will consist of standard integrated circuits.
The memory will be organized as 32K quadwords (64 bits). The error correction will
thus be done over a 64 bit word. Transfers between processors or the I/O system and
memory will be either single words( 16 bits) or integer numbers of quadwords. The
NoteTaker Project Plan 3
memory can transfer data at the rate of about 1 word every 100ns. The fraction of this
160 mbs bandwidth which will actually be available is not specified yet.
The third important building block of the system is the I/O section. Here we will make
use of as many standard LSI components as possible. The I/O system will be controlled
by a processor such as the Intel 8086. This I/O processor will handle much of the
overhead associated with setting up and completing I/O transfers. The communication
between the I/O section and the emulation (custom LSI) processor will be handled
through main memory.
The system will be designed such that one can attach multiple processors to the
common memory bus. This capability will allow us to explore the problems and
opportunities of a multiprocessor system.
The performance of this system in terms of instruction execution speed will be in the
same class as the current DO/MSI machine. The micro-cycle will be less than 150 ns.
and could possibly be under 100 ns. when the design matures and circuit bottlenecks
are removed.
3.0 The LSI design team
This project offers an exceptional opportunity for the systems, circuit, and process
rll'"\C':n .... I'"\ ... ' " i .... DADf" " .... rI Cf""'\r\ +" .. ,,, ... 1.- +",....,-,.+h"' ... /= .. "".... +h" hr.,....; ........ ; .... ,.... +" rI"""I"", '" "",,,,,,,, .. ,,.r
Uvvl'::::II'vl v III I r l l ''''' UIIU '-'-'L..f LV YYVI r, LV'::::IOLllvl II VII' Lllv UOl::fIlIlIlIll::f LV UOV'OIVt-J a t-JVYV'OIIUI
set of LSI components.
This will be a very important project for the LSI effort at PARCo The LSI group at PARe
has been working in integrated circuit design for about 1 1/2 years. The time is right to
apply the tools and knowledge we have developed to a significant problem. We have
much to discover about how such an LSI project should be organized, what types of
documentation are most useful to the designer, where the real bottlenecks in design
process are when using the structured design approach, and what the tradeoffs are in
the area of structured design vs. the desire for maximum speed and density.
The small group that is being put 'together for this project will include individuals from
various backgrounds and skills. We feel this experiment of using a tightly coupled group
to do a major LSI project will be most educational to all participants. It is just this type of
effort which will be essential in developing the truly powerful integrated systems of the
future.
4.0 Design Strategy
All the chips will be layed out using the ICARUS design system. The design rules
chosen will most likely be those of the NSIL II process. They may be scaled up initially
to meet the requirement that we be able to run under a relaxed set of rules if the new
process is not available in time.
There will be a conversion program developed to allow the transfer of data from the
ICARUS system to the Calma system. This will provide a convenient backup position if
ICARUS should become a limitation and it will also allow us to make use of the design
rule checking and pattern generation programs which are available in EI Segundo.
The overall chip size will be about 40 mm 2 (6.25 mm on a side). This size is chosen on
the basis of yield considerations and power dissipation. Each chip can't be allowed to
dissipate greater than about 1 watt. In connection with this, there is consideration being
given to running the chips at 3 volts instead of 5 volts to minimize power dissipation and
increase speed.
In order to debug the design and checking process, which will involve conversion of
ICARUS files to Calma format and checking them, we will want to design one or two
relatively small circuits to run through the process in mid-summer. These chips will be a
display controller chip and a preliminary version of the memory mapping chip. These
circuits will be designed using the NSIL I design rules, as it is likely that the new process
NoteTaker Project Plan 4
will not be available by then.
4. 1 IC Fabrication
As has been the case with other circuits designed at PARC and in EOO/MEC, we do not
wish to so closely tailor our designs to a process that the chips can only be fabricated
on one line. The MEC line will be runnning the new NSIL II process by the time we need
to actually fabricate chips in the fall. Dirk Bartelink will likely have such a process
available at about the same time. We would be happy to make use of whichever line is
available at the time. We also anticipate that in 1979 that there will be lines in other
semiconductor processing firms which are capable of processing our chips as well.
Eventually we will want to move the production of the chips to an outside facility as was
done with the LCC. .
5.0 The NoteTaker Design Team
Designing the appropriate LSI chips is only part of the NoteTaker design problem. I will
be relying on a great deal of help from EOD/SPG in the area of system electronics and
packaging design. The principals in the project from that group are Ed Wakida, Bob
Nishimura, Jim Leung, and Ron Freeman. These people have already designed and built
a mockup of the NoteTaker system with essential components in place. They have
handled investiqations into hybrid technoloQY as well as keyboards, displays, power
supplies, and packaging optCons. -- - - - -
The system electronics other than the processor will be designed by Ron Freeman and
Jim Leung. Interaction with vendors on such components as power supplies and monitor
will be handled by Ed Wakida. Design of an LSI controller for the CRT monitor Will be
done by Jim Leung.
6.0 System Packaging
A principal goal of the NoteTaker packaging effort is to avoid the mistakes made in the
Alto packaging. The Alto terminal housings were engineered for very small lot
production and were thus a constant headache when multiple builds of the machine_
occurred. The NoteTaker packaging is being done with the idea that at least 200 units
will be built, possibly many more.
A mockup of the unit has already been completed. This mockup will be analyzed and
modified over the next couple of months to determine the best overall packaging
scheme. We will then build a prototype of the unit which will be as close to the final unit
in terms of shape and materials as possible. We will exercise or simulate all the major
components in this package to insure that we have adequately solved such problems as
heat dissipation. -
This prototype will again be analyzed and evaluated before final drawings and
subsequent tooling is done. The final package design will be engineered for moderate
volume production requirements.
7.0 Component and System Tes~ing
The chips to be designed are large and very complex. Because of this, the testing
strategy will have to be built into the chips.
The chips will be functionally tested on the Alto using the general purpose LSI system
tester which will be built in the next three months. Detailed testing and characterization
will probably be done on the Sentry system in EI Segundo.
Checkout of the NoteTaker system excluding the processor can be done from the Alto
as well. The memory and I/O system will be designed and checked out before the LSI
processor chips are ready to plug in.
NoteTaker Project Plan 5
8.0 Design VS. Buy
The question of why we don't just buy what we want often comes up. The usual answer
is of course that the systems we envision are not availabie on the market and are not
likely to be in the near future. This is certainly true in this case with respect to the
package, memory and I/O system, although it might still be argued that there will soon be
an LSI processor available which might do our task sufficiently well.
This latter statement may be true in the case of the NoteTaker, at least to a limited
degree. We could package the new Intel 8086 processor into the system which I have
just described. This processor would not offer the performance of the Alto but it might
be adequate for a limite,d set of applications. It is apparent that we can design a
processor of significantly greater power ourselves, however. We will also learn a great
deal about the design issues and we will have developed a base on which to design
even more powerful processing elements in the future.
An alternative way of asking this question is "why not build our own chips"? The most
common answer is that it is so difficult, time consuming, and expensive. We are
interested in applying a more structured approach to the problem to see what benefits
this technique offers. If it turns out that Ie design can be simplified, and design time
reduced, some of the reasons for not taking advantage of power of LSI in the future will
be nullified.
9.0 Manpower Requirements
The basic manpower requirements of the project are shown below:
3 LSI designers - 24 man-months
2 Logic designers - 12 man-months
(System design, tester design, etc.)
2 Physical/Electrical packaging - 10 man-months
2 Programmers - 18 man-months
(Microcode, system simulations, I/O controller software, tester software.)
- Project coordinator - 6 man-months
- Engineer/Technician - 6 man-months
- Expiditer - 3 man-months
1 0.0 Schedule
The present schedule calls for the total package to be put together with the first working
versions of the processor chips in April 1979. By this time, we should be set up to make
several dozen of these machines. .
The greatest uncertainties lie with the LSI chips. The schedule allows for the first batch
to be wrong and four months to correct problems and turn the new designs around. The
other system components and the packaging will be designed and readied for production
so the systems can be produced when the first LSI chips become available.
Appendix A - Preliminary NoteTaker Block Diagram
,----------------- LOW
SPEED EIA
ALU DEVICES Keyboard
~ (1 ) etc.
DISPLAY Horiz
------ CONTROL
(2)
--7
CONTROLLER
(Custom)
Vert.
Video
114
I
16
IFU
- DISK Floppy
(1 ) Disk
CONTROLLER
1K x 16
Cache DMA
(4)
I "'...,., ... . ., . . . . . . ,
"n"ITQ()1 I J:'Q
Cache Map
and Control LOCAL
(2) MEMORY
Memory Map
and Control CPU
(1 ) 8086?