
EXHAUST SYSTEM
B ENGINE
A
SECTION
EXHAUST SYSTEM
EX EX
C
D
E
CONTENTS
PREPARATION .......................................................... 2
. Checking Exhaust System ....................................... 3
. F
Commercial Service Tools ....................................... 2
. Removal and Installation ......................................... 3
.
EXHAUST SYSTEM .................................................. 3
. REMOVAL ............................................................ 3
.
INSTALLATION .................................................... 4
. G
INSPECTION AFTER INSTALLATION ................. 4 .
H
I
J
K
L
M
Revision: 2005 September EX-1 2006 Murano
PREPARATION
PREPARATION PFP:00002
Commercial Service Tools NBS002RT
Tool name Description
Power tool Loosening nuts and bolts
PBIC0190E
Revision: 2005 September EX-2 2006 Murano
EXHAUST SYSTEM
EXHAUST SYSTEM PFP:20100
A
Checking Exhaust System NBS002RU
Check exhaust pipes, muffler and mounting for improper attachment,
leaks, cracks, damage or deterioration. EX
q If anything found, repair or replace damage parts.
C
D
SMA211A
E
Removal and Installation NBS002RV
CAUTION:
q Be sure to use genuine exhaust system parts or equivalents which are specially designed for heat F
resistance, corrosion resistance, and shape.
q Perform the operation with the exhaust system fully cooled down because the system will be hot
just after engine stops.
G
q Be careful not to cut your hand on heat insulator edge.
H
I
J
K
L
M
PBIC1777E
1. Mounting bracket 2. Ring gasket 3. Exhaust front tube bracket
4. Exhaust front tube 5. Gasket 6. Center muffler
7. Main muffler 8. Mounting rubber 9. Main muffler (GXE grade)
REMOVAL
Disconnect each joint and mounting using power tool.
Revision: 2005 September EX-3 2006 Murano
EXHAUST SYSTEM
INSTALLATION
Note the following, and install in the reverse order of removal.
q If exhaust front tube stud bolts were removed, and install them and tighten to the specified torque below.
: 14.7 N