Service Manuals, User Guides, Schematic Diagrams or docs for : . Car Manuals Toyota Tundra 2000-2006 Approved 04-06 techinfo.toyota.com ileaf 06toyrm 06toypdf 06rmsrc 06tundra st1grfe star16kw insp
<< Back |
HomeMost service manuals and schematics are PDF files, so You will need Adobre Acrobat Reader to view : Acrobat Download
Some of the files are DjVu format. Readers and resources available here : DjVu Resources
For the compressed files, most common are zip and rar. Please, extract files with Your favorite compression software ( WinZip, WinRAR ... ) before viewing.
If a document has multiple parts, You should download all, before extracting.
Good luck. Repair on Your own risk. Make sure You know what You are doing.
Image preview - the first page of the document
>> Download insp documenatation <<Text preview - extract from the document ST-7
STARTING (1GR-FE) - STARTER (1.6 kW)
ST0PP-01
INSPECTION
Continuity 1. INSPECT COMMUTATOR FOR OPEN CIRCUIT
Using an ohmmeter, check that there is continuity between the
segments of the commutator.
If there is no continuity between any segment, replace the ar-
mature.
A23155
2. INSPECT COMMUTATOR FOR GROUND
(a) Using an ohmmeter, check that there is no continuity be-
No Continuity tween the commutator and armature coil core.
If there is continuity, replace the armature.
(b) Check that the commutator for dirty and burm on surface.
If the surface is dirty or burnt, correct it with sandpaper (No.400)
or on a lathe.
A23156
3. INSPECT COMMUTATOR LENGTH
(a) Using vernier calipers, measure the commutator length.
Standard length: 3.1 mm (0.122 in.)
Maximum length: 3.8 mm (0.150 in.)
Length If the length is greater than maximum, replace the armature.
A23157
4. INSPECT STARTER COMMUTATOR END FRAME
ASSY
Length
(a) Using vernier calipers, measure the brush holder length.
Standard length: 9.0 mm (0.354 in.)
Maximum length: 4.0 mm (0.158 in.)
If the length is less than minimum, replace the starter commuta-
tor end frame assy.
A23158
(b) Check the brush holder.
No Continuity
(1) Using an ohmmeter, check that there is no continu-
ity between the positive (+) and negative (-) brush
holders.
If the there is continuity, repair or replace the starter commuta-
tor end frame assy.
If there is no continuity, repair or replace the field frame.
A23159
ST-8
STARTING (1GR-FE) - STARTER (1.6 kW)
5. INSPECT CLUTCH PINION GEAR
Rotate the pinion gear clockwise, and check that it turns freely.
Free
Check that it locks by rotating the pinion gear counterclockwise.
If necessary, replace the clutch assembly.
Lock
A23160
6. INSPECT REPAIR SERVICE STARTER KIT
(a) Check the plunger.
(1) Push in the plunger and check that it returns quickly
to its original position.
If necessary, replace the repair service starter kit.
A23161
7. INSPECT MAGNET STATER SWITCH
Terminal 50
(a) Check the pull-in coil for open circuit.
(1) Using an ohmmeter, check that there is continuity
between terminal 50 and C.
If there is no continuity, replace the repair service starter kit.
Continuity
Terminal C
A23162
(b) Check whether or not the hold-in coil has an open circuit.
Terminal 50
(1) Using an ohmmeter, check that there is continuity
between terminal 50 and the switch body.
If there is no continuity, replace the repair service starter kit.
Continuity A23163
◦ Jabse Service Manual Search 2026 ◦ Jabse Pravopis ◦ onTap.bg ◦ Other service manual resources online : Fixya ◦ eServiceinfo