Service Manuals, User Guides, Schematic Diagrams or docs for : . Car Manuals Toyota Tundra 2000-2006 Approved 04-06 techinfo.toyota.com ileaf 06toyrm 06toypdf 06rmsrc 06tundra st1grfe star20kw insp

<< Back | Home

Most service manuals and schematics are PDF files, so You will need Adobre Acrobat Reader to view : Acrobat Download Some of the files are DjVu format. Readers and resources available here : DjVu Resources
For the compressed files, most common are zip and rar. Please, extract files with Your favorite compression software ( WinZip, WinRAR ... ) before viewing. If a document has multiple parts, You should download all, before extracting.
Good luck. Repair on Your own risk. Make sure You know what You are doing.




Image preview - the first page of the document
insp


>> Download insp documenatation <<

Text preview - extract from the document
                                                                                                      ST-19
                           STARTING (1GR-FE)       -   STARTER (2.0 kW)
                                                                                                       ST0PW-01


Ohmmeter                                  INSPECTION
                                          1.     INSPECT COMMUTATOR FOR OPEN CIRCUIT
                    Continuity            Using an ohmmeter, check that there is continuity between the
                                          segments of the commutator.
                                          If there is no continuity between any segment, replace the ar-
                                          mature.


                                 S00054



                                          2.     INSPECT COMMUTATOR FOR GROUND
                                          (a)    Using an ohmmeter, check that there is no continuity be-
                                                 tween the commutator and armature coil core.
                                          If there is continuity, replace the armature.
                                          (b) Check that the commutator for dirty and burm on surface.
                                          If the surface is dirty or burnt, correct it with sandpaper (No.400)
    No Continuity
                                          or on a lathe.

                                 S00055



                                          3.     INSPECT COMMUTATOR CIRCLE RUNOUT
                                          (a)    Place the commutator on V-blocks.
                                          (b)    Using a dial indicator, measure the circle runout.
                                                 Maximum circle runout: 0.05 mm (0.0020 in.)
                                          If the circle runout is greater than maximum, correct it on a lathe.




                                 S00056



                                          4.     INSPECT COMMUTATOR DIAMETER
                                          Using vernier calipers, measure the commutator diameter.
                                                 Standard diameter: 35.0 mm (1.378 in.)
                                                 Minimum diameter: 34.0 mm (1.339 in.)
                                          If the diameter is less than minimum, replace the armature.




                                 S00057



                                          5.     INSPECT UNDERCUT DEPTH
                                          Check that the undercut depth is clean and free of foreign mate-
                                          rials. Smooth out the edge.
                                                 Standard undercut depth: 0.7 mm (0.028 in.)
                                                 Minimum undercut depth: 0.2 mm (0.008 in.)
                                          If the undercut depth is less than minimum, correct it with a
                                          hacksaw blade.

                                 ST0040
ST-20
                                         STARTING (1GR-FE)   -   STARTER (2.0 kW)

                                                    6.     INSPECT BRUSH
                                                    (a)    Check the brushes length
 Brush Holder                                              (1) Using vernier calipers, measure the brush length.
 Side
                                                           Standard length: 15.0 mm (0.591 in.)
                                                           Minimum length: 9.0 mm (0.354 in.)
                                                    If the length is less than minimum, replace the brush holder and
                                                    starter yoke.


    Length
 Starter Yoke Side




                                Length
                                           A23177



                                                    7.     INSPECT STARTER BRUSH HOLDER ASSY
                                                    (a)    Check the blush holder insulation
                                                           (1) Using an ohmmeter, check that there is no continu-
                                                                 ity between the positive (+) and negative (-) brush
                                                                 holders.
                                                    If there is continuity, repair or replace the brush holder.

   No continuity
                                           A23178



                                                    (b)    Check the brush spring load.
                                                           (1) Take a pull scale reading at the instant the brush
                                                                 spring separates from the brush.
                                                           Standard spring load:
                                                           21.5 to 27.5 N (2.2 to 2.8 kgf, 4.8 to 6.2 lbf)
                                 Brush                     Minimum spring load: 12.7 N (1.3 kgf, 2.9 lbf)
                                 Spring             If the spring load is less than the minimum, replace the brush
         Brush                                      holder.
                                           ST0019



                                                    8.     INSPECT FIELD COIL FOR OPEN CIRCUIT
                                                    Using an ohmmeter, check that there is continuity between the
                   Continuity                       lead wire and field coil brush lead.
                                                    If there is no continuity, replace the field frame.


 Ohmmeter


                                           P10588
                                                                                                       ST-21
                                  STARTING (1GR-FE)   -   STARTER (2.0 kW)

                                             9.     INSPECT SHUNT COIL FOR OPEN CIRCUIT
             Continuity                      Using an ohmmeter, check that there is continuity between the
                                             field coil end and field frame.
                                             If there is no continuity, repair or replace the field frame.
  Ohmmeter




                                    P00299



Ohmmeter                                     10. INSPECT SHUNT COIL FOR OPEN CIRCUIT
                                             Using an ohmmeter, measure the resistance between shunt
                                             coil terminals (A) and (B).
                 (A)
                                     (B)            Resistance: 1.5 to 1.9  at 20 



◦ Jabse Service Manual Search 2026 ◦ Jabse PravopisonTap.bg ◦ Other service manual resources online : FixyaeServiceinfo